27750 Ton Topside Float Over
- Birds eyeview of the location
- Topside on sail to location
- Construction Barge at Jacket for Preperation
- Jacket preparation
- Housekeeping before the caos
- Entering the gate for installation
- Manoeuvre of the Intermac 650 with topside into final position
- Checking position
- Finalising position
- Start to seat the topside
- Cutting travel clamps
- Final cut
- Seating
- Seating
- Final inch
- Seperation of the support columns
- An inch seperation
- Ready to move out
- Complete Topside installation
Damages
- 10 ton chain hoist shock loading
- Farelead damage
- Melt down of a Flareboom tip
- Not anticipating stored energy 30 inch laydown head
- Visiting a Blowout of a flareboom
- Wire rope damage
Jackets And Up Ending
Lifts And Rigging Arrangements
- Four leg bridal with a spreaderbar
- landing a link to connect a new set of rigging
- Lifting 250 ton sat system
- lifting a 350 ton Flareboom
- Lifting on a riser collar
- Preparing rigging to a flareboom
- PRF 2
- PRF 3
- PRF 4
- PRF 5
- PRF 6
- PRF 7
- PRF 8
- PRF 9
- Rigging arraingement on a laydown head
- Rigging arraingement
- Spacer installed in the laydown head rigging
- Tandum lift
- The use of a Basket to rig up slings
- Three leg bridal spool piece
- Working out of a basket on shrink sleaves
Maintenance
- 1200 ton main block
- Boom Wire Inspection
- Inside a 16 Cylinder Deasel Ship Motor
- Main Block Maintenance
- Ship diesel motor
- Stinger mantenance
Stabing Bear Clamps And Risers
Tool Box Talks
- On the Job training
- Visual aids
- Practical Training
- Execution of task
- Preshift Meetings
- Stand down meeting
- Toolbox talk
Miscellaneous